Waiting on This Road! Chiang Saen-Chiang Khong 4-Lane Expansion Complete, Ready for Tourism - Chiang Rai Special Economic Zone - R3A
The Department of Highways, through Construction Division 1, has constructed Highway No. 1290, Chiang Saen District – Chiang Khong District, Chiang Rai Province, between km.72+027 – km.93+027, a total distance of 21 kilometers
The project involves construction to a first-class highway standard (2 traffic lanes), restoring the original 2-lane highway from a carriageway width of 3.5 meters per lane and 1-meter shoulders on each side, widening the roadbed to a carriageway width of 3.5 meters per lane with 2.5-meter shoulders on each side, and adding a Climbing Lane on steep uphill sections, including the installation of lighting and flashing signal lights
The Department of Highways has now completed the project, which will help make traffic flow smooth, fast, convenient, and safe, developing infrastructure to promote and support logistics transportation, accommodate the Chiang Rai Special Economic Development Zone, and elevate trade and tourism

The Highway No. 1290 construction project, Chiang Saen District – Chiang Khong District route, is a main road connecting Chiang Saen District – Chiang Khong District. Currently, the Chiang Saen Port No. 2 and the 4th Friendship Bridge (Huay Sai – Chiang Khong) (The GMS , North – South Economic Corridor Bridge) are under construction
As a result, the areas of Chiang Saen District and Chiang Khong District have been designated as the Chiang Rai Special Economic Zone. This route is also considered part of the R3A route (Thailand – Laos – China), connecting with neighboring countries and supporting the Quadrangle Economic Cooperation and the ASEAN Economic Community or AEC going forward



Thank you for the images and news from Prachachat Business
https://www.prachachat.net/property/news-278000


















